M5 Extensions, Cooks River: Sydney, NSW
Xypex Admix C1000NF was dosed into 3,850 M3 of 40 MPa concrete for waterproofing and durability requirements in the marine environment.
Xypex product was tested under conditions set by the joint Venture between Bilfinger Berger & Baulderstone Hornibrook and the Roads & Traffic Authority NSW.
The project exceeded all performance specification requirements for a 100 year design life.


