HEAD OFFICE
+612 6040 2444
ACT +612 9896 4999
NSW +612 9896 4999
NT +618 8297 1288
QLD +617 3442 4300
SA +618 8297 1288
TA +613 9543 7933
VIC +613 9543 7933
WA +618 9434 3844
+647 575 5410
Singapore +65 6299 5836
Malaysia +603 5192 8186
Indonesia +62 21 420 1909
The Middlings bunker wall of the Moura Coal mine required numerous repair work to rectify concrete that had experienced degradation.
The repair methodology involved the removal of all spalled concrete, cleaning of all rusted reinforcing steel and acid washing of surfaces, to provide a clean surface for the application of Xypex repair products