Xypex C-Series used in restoration of Busselton Jetty: Western Australia

busselton_jetty_sml brusselton_lrg2
brusselton_lrg3 brusselton_lrg4
brusselton_lrg5 brusselton_lrg1

Stretching 1.8 kilometres across Geographe Bay, Busselton Jetty is the longest timber-piled jetty in the Southern Hemisphere. It is appreciated for its spectacular Underwater Observatory, Jetty Train and myriad of recreational uses.

In May 2009 Marine and Civil Construction Company Pty Ltd was awarded the $27.1 million refurbishment contract. The refurbishment included

  1. The complete replacement of approximately 50% of the 1.8km existing Jetty structure. This requires demolition of approximately 900m of the existing Jetty;
  2. Temporary dismantling for substantial repairs to the remaining 50%;
  3. Driving of approximately 200 new timber piles and 108 steel piles predominantly for the new 900m section;
  4. Reconstruction of various parts with timber decking for heritage values;
  5. Refurbishment of the small 'Scout Road Jetty' located 100m east of the main Busselton Jetty.


Xypex Admix C-5000 was specified for all concrete used in the refurbishment as protection of concrete used in a marine environment.


< Return to Projects

Stretching 1.8 kilometres across Geographe Bay, Busselton Jetty is the longest timber-piled jetty in the Southern Hemisphere. It is appreciated for its spectacular Underwater Observatory, Jetty Train and myriad of recreational uses. A unique experience situated in Western Australia's favourite playground!

In May 2009 Marine and Civil Construction Company Pty Ltd was awarded the $27.1 million refurbishment contract. The refurbishment included

·         The complete replacement of approx. 50% of the 1.8km existing Jetty structure.    This requires demolition of approx. 900m of the existing Jetty;

·         Temporary dismantling for substantial repairs to the remaining 50%;

·         Driving of approx. 200 new timber piles and 108 steel piles predominantly for the new section 900m section;

·         Reconstruction of various parts with timber decking for heritage values;

·         Refurbishment of the small ‘Scout Road Jetty’ located 100m east of the main Busselton Jetty.

Xypex Admix C-5000 was specified for all concrete used in the re