HEAD OFFICE
+612 6040 2444
ACT +612 9896 4999
NSW +612 9896 4999
NT +618 8297 1288
QLD +617 3442 4300
SA +618 8297 1288
TA +613 9543 7933
VIC +613 9543 7933
WA +618 9434 3844
+647 575 5410
Singapore +65 6299 5836
Malaysia +603 5192 8186
Indonesia +62 21 420 1909
AGL Southern Hydro has constructed the Bogong Power Development, part of the Kiewa Hydro Electric Scheme near Mt Beauty in Victoria.
Two turbines will be installed and will generate 140mw.
Xypex Admix C-1000 NF was specified in 12,000 cubic metres of concrete for the purpose of water proofing and providing long term durability to the structure. Concrete was supplied by Cemex from a mobile batch plant, 32 MPA concrete was dosed at 1%. (In excess of 45,000 kg's of Xypex Admix was used).
Tie bolt holes were patched utilizing the Xypex repair system which included M P&P and Flupps 22ST to 5,000 tie bolts.