HEAD OFFICE
+612 6040 2444
ACT +612 9896 4999
NSW +612 9896 4999
NT +618 8297 1288
QLD +617 3442 4300
SA +618 8297 1288
TA +613 9543 7933
VIC +613 9543 7933
WA +618 9434 3844
+647 575 5410
Singapore +65 6299 5836
Malaysia +603 5192 8186
Indonesia +62 21 420 1909
Xypex has a range of Method Statements and Schematics for new structures that will assist in your specification, application and installation.
Schematic No. 1
Construction Joint Cold Joint Details - Traffic Bearing Slabs
Schematic No. 3
Construction Joint Cold Joint Details - Wall onto Slab Detail
Schematic No. 12
Schematic No. 15
Construction Joint Cold Joint Details - Hydraulic Elevator Pit
Schematic No. 16
Construction Joint Cold Joint Details - Elevator Pit, Sump Pit
Schematic No. 17
Schematic No. 18
Construction Joint Cold Joint Details - Tunnel or Service Tunnel
Schematic No. 19
Schematic No. 20
Construction Joint Cold Joint Details - Sewage Plant Clarifer Tank
Schematic No. 23
Construction Joint Cold Joint Details - Underground Vault, Dry Well
Schematic No. 24a
Construction Joint Cold Joint Details - Precast, Formed Concrete Manhole
Schematic No. 25
Schematic No. 26a
Construction Joint Cold Joint Details -Precast, Formed Pump Station